Cramlington Learning Village, Newcastle

IKO Mach one system

In May of 2022 Celestial Roofing were approached and asked to help with a flat roof that had blown off a live school due to excessive high winds. This was a top priority job and we jumped at the chance to help out.

Once the site was made secure, we first cut back the defective single ply in a straight-line, end to end to form a separation of the new roof to the old. We then installed a timber upstand to divide the two roofs as one side was singly ply and one side now a felt system. Working 7 days a week the team managed to safely remove all waste from site and install a new IKO Mach 1 Roofing system.

The school were free to resume operations as normal within a few weeks and were extremely satisfied with the results. Hats off to the installers on this one for the quick turnaround and immaculate workmanship.