Warm Roof System Installation at Springwell School

This job was another Garland Specification. The scope of works was to strip the existing roof off down to the original deck and install a new 3 layer, warm roof system.

This consisted of a heat activated vapour control layer, tapered insulation, torch  on underlay and mineral cap-sheet. Duration 10 weeks.