Celestial Felt Roofing Specialists

Garland Specification Roofing at Middlesborough School

This job was another Garland specification. The scope of works was to overlay the existing roof system but with all internal gutters stripped and renewed.

The system was built up of a torch on vapour control layer, tapered insulation, underlayer and mineral capsheet. Duration - 6 weeks.